BRAIAIN
Methodology & sources
Last updated: 2026-10-20
How every number on the board is made
Rules first: nothing appears without a named public source and a date. Moving figures are arithmetic on sourced numbers, never telemetry: flows tick at their filed pace; a count ticks only as a clearly labeled pace measured between two dated observations and run forward; shares never tick. Anything we could not source got cut, and this page says what that was. Each metric also has its own page with the full table, sources and downloads — linked throughout. Board last re-based October 20, 2026.
The hero figure
The headline counter is big-4 capex only: $513.8B (Microsoft, Alphabet, Amazon, Meta, four quarters to Jun 30, 2026, as filed) ÷ 31,556,952 seconds = $16,281.93/second, about $1.41B/day. It deliberately excludes NVIDIA's data-center revenue to avoid double-counting; NVIDIA appears separately. The combined, overlapping flow ($25,082/s) remains the Buildout Index's basis and is documented below. Changed Oct 20, 2026 after panel review; logged in the changelog.
Plain-language conversions — the arithmetic
- PJM serves "more than 67 million people across 13 states and DC" — PJM's own pages and releases (2026).
- Capacity price ≈ 1.1¢/kWh: $269.92/MW-day ÷ 24h ÷ 1,000 kW = 1.12¢ per kWh if usage were flat around the clock ($28.92 → 0.12¢). A simplification: real bill impact depends on region, peak usage and state pass-through.
- Bills rose an estimated 1.5–5% in the first repriced PJM year — PJM figures as reported by WHYY, Jul 2025; utilities pass wholesale costs to customers.
- A US home uses ~30 kWh/day: EIA FAQ — 10,791 kWh per residential customer in 2022 ÷ 365.
- 47 → 108 GW: 415 and 945 TWh/yr ÷ 8,760 hours. 129 reactors: 107.9 GW ÷ 0.835 GW (Three Mile Island Unit 1's announced capacity).
- ND flaring ≈ heat for ~1 million homes: 173.3 MMcf/d ÷ ~163 cf/day per gas home (derived from EIA 2024: 4,389,004 MMcf across 73.7M residential customers).
- 31x: 233 GW of ERCOT large-load requests ÷ 7.48 GW under construction (CBRE) — requests vs real construction.
- ~4M gal/day: ICPRB's 4 MGD average-day consumptive figure for Potomac-basin data centers (~9% of the area's consumptive use).
How opinions are marked
Narrative framings on the board (chapter sentences, the Bakken juxtaposition) are ours and are written to be checkable against the data shown; the one standing editorial product — the Reckoning — is explicitly tagged EDITORIAL, with its conditions and thresholds fixed on Oct 20, 2026, before any pending outcome. The Reckoning carries no Dataset markup and is excluded from the citable datasets.
The wall — every live counter's formula
- Hero (big-4): see above — $16,281.93/s. The combined overlapping flow ($25,081.89/s trailing-year; $32,435/s at the latest-quarter pace) is retained here and on the index page.
- VC into AI: $102B (Q3 2026, Crunchbase) ÷ 92 days = $12,832/s at the Q3 pace.
- New ChatGPT users: (1.2B − 900M) ÷ 214 days between OpenAI's Feb 27 and Sep 29, 2026 statements = 16.2/s — the measured pace, run forward (an extrapolation).
- Data-center electricity: IEA's 415 TWh (2024, all data centers) ÷ seconds in a year = 13,151 kWh/s.
- Stargate: shown as a static $500B commitment. The former per-second counter ($3,961/s if spent evenly) was removed Oct 20 as a hypothetical, not a measured pace.
- Models published: (3,157,435 − 2,678,385) ÷ 228 days between archived Hugging Face counts = one repository every ~41 s.
- Tape: one arXiv cs.AI listing every ~8.2 min (51,361 in 292 days of 2026); one announced AI-cited US job cut every ~3.3 min (120,136 in 273 days); 46.3 gal/s of Potomac-basin data-center consumptive water (4 MGD average, ICPRB); 1,534 days to Jan 1, 2031 as of this re-base.
The Buildout Index
As of Q2 2026 the BRAIAIN Buildout Index stands at 647.7 (base: Q1 2022 = 100) — a 6.5x rise in 18 quarters, 55.2% compounded annually, including a dip to 97.7 in Q1 2023.
Index(q) = 100 × [ Capex_MSFT + Capex_GOOGL + Capex_AMZN + Capex_META + DCRev_NVDA ](q) ÷ [ same sum, Q1 2022 ]
Definitions as filed: Microsoft and Alphabet report cash purchases of property and equipment; Amazon reports gross purchases (not netted for proceeds); Meta includes finance-lease principal, matching its own release figures. NVIDIA is data-center segment revenue; its fiscal quarters end ~1 month after calendar quarters and are mapped to the nearest one. Quarters not reported directly are derived by subtracting YTD figures within or across the same company's filings — each derivation is recorded in the data file. The components overlap (chips the big 4 buy from NVIDIA appear in both their capex and NVIDIA's revenue), so the sum is a gross, overlapping flow — a measure of buildout intensity, not a de-duplicated market total. Quarterly table figures are rounded; totals and index values are computed from unrounded filings. Full table and FAQ: the index page; component sources: the capex page.
Capital
Big-4 capex: $513.8B over the four quarters to June 30, 2026 (AMZN $173.0B, GOOGL $132.4B, MSFT $115.9B, META $92.4B); 18-quarter history to Q1 2022.verified
All 90 quarterly component figures (70 backfilled, 20 current) are primary-sourced from SEC filings and earnings releases, with derivations recorded. Guidance: Meta 2026 capex $130–145B (its Q2 2026 release, verified); Alphabet $195–205B and Amazon ~$220B are earnings-call figures known via press (weaker). Sources and table:
capex page.
NVIDIA data-center revenue: $277.7B over four quarters to Jul 26, 2026; quarterly from $3.75B (FQ1 FY23) to $89.0B (FQ2 FY27).verified
Segment figures from each quarter's release/CFO commentary; fiscal-year sums reconcile ($15,005M FY23, $47,525M FY24, $115,186M FY25).
AI venture funding: $102B of $159B global in Q3 2026 — 64%.verified
Stargate: $500B announced over four years.verified
Power
PJM capacity prices: 22 delivery years, $40.80 (2007/08) through $325.00 (2028/29); $28.92 → $269.92 in one cycle; three auctions at the FERC cap; 2027/28 cleared 6,623 MW and 2028/29 6,831 MW short of requirement.verified
Compiled from PJM's own auction reports and releases; 2018/19+ are UCAP-based. Clearing at the cap means price understates scarcity. Cause is not attributed by this series. Full table, sources and caveats:
PJM page. PJM publishes no open license; numeric facts are compiled with credit and PJM text/charts are not reproduced.
US industrial electricity: 6.67¢/kWh (2020) → 8.62¢ (2025 preliminary), +29% nominal; July 2026 monthly 9.77¢ (+4.7% YoY).verified
EIA (public domain): Electric Power Monthly Table 5.3 and Electric Power Annual Table 2.4, which agree in overlapping years. National, nominal, cause not attributed.
Series page.
Global data-center electricity: ~415 TWh in 2024 (~1.5%), projected ~945 TWh by 2030; 2035 cases span ~700 to >1,700 TWh. US: 176 TWh = 4.4% (2023), projected 6.7–12% by 2028.verified (projections labeled)
Hyperscaler nuclear: 7,754 MW across six named deals, Sep 2024 – Jan 2026; none since.verified (sum is ours)
Deal-by-deal sources on the
nuclear page. Announced ≠ operating; first delivery is the Crane restart targeted 2027. Pace measured first-announcement-to-now: ~3.6 GW/yr.
Compute & research
Hugging Face: 3,157,435 public model repositories (archived Oct 16, 2026; live counter read 3,169,809 on Oct 20); 12-point archived series from 31,709 (Mar 2022); doubling every 8.1 months on average (log-linear fit, R²=0.957, n=12; the most recent interval implies a slower ~32-month doubling).verified
Each point machine-read from an Internet Archive capture's own counter, dated by the capture header. Repositories include finetunes and forks.
Series page.
GPU rental: median on-demand H100 $2.99 → $3.50/GPU-hr Oct 2025 → Oct 2026 (+17%); H200 $3.50 → $4.88.verified
GetDeploying GPU price dataset, CC BY 4.0, credit GetDeploying — five sampled weekly medians across the year. Provider medians; mix shifts can move the median. Lambda list price H100 SXM $3.99 (fetched Oct 20, page undated).
Series page.
Token list prices: flagship output $50/1M (GPT-6 Astra; Claude Fable 5.1) vs GPT-4 Turbo $30 (Nov 2023) and Claude 3 Opus $75 (Mar 2024); mid tier at $10.verified (list prices; pages undated, fetched Oct 20)
Providers' own pricing pages. List prices ignore discounts/caching; generations are not like-for-like.
Table.
Epoch AI trends (as of Feb 5, 2026): frontier training compute 5x/yr (doubling 5.2 months, 90% CI 4.6–6.0); AI chip stock doubling every 6.8 months; chip performance per dollar +49%/yr since 2023 (≈33% cheaper per unit of performance per year); largest known AI data center ~1.1M H100-equivalents; ~2 years to build a gigawatt-scale data center. Notable models: 107 released in 2025, 84 in 2026 through Sep 30 (recent years get back-filled — lower bounds).verified
Epoch AI, data under Creative Commons Attribution ("free to use, distribute, and reproduce provided the source and authors are credited").
arXiv: cs.AI listings 7,414 (2020) → 45,102 (2025); 51,361 in 2026 through Oct 20.verified
Listing-page totals, which include cross-lists — labeled "listings," not submissions. arXiv metadata is CC0.
Data.
Infrastructure & the map
The map: 1,818 US features tagged telecom=data_center in OpenStreetMap (1,816 in the lower 48, drawn; 2 in territories), extracted via Overpass API Oct 20, 2026.verified
Map data © OpenStreetMap contributors, ODbL. Real coordinates; campuses can appear as multiple buildings. A community-mapped floor, not a census — Data Center Map counts >3,000 operating and >1,500 in development (as of Feb 19, 2026) per
Pew Research Center. The two methods are never merged.
Counts page + download.
CBRE H1 2026 (North America primary markets): 7,481 MW under construction (record), 1.4% vacancy, 80.4% pre-leased.verified
CBRE, cited with attribution.
ERCOT large-load queue: >233 GW, >70% data centers, year-end 2025.verified via trade press citing ERCOT
Utility Dive, Jan 2026. Queue requests are not committed load; ERCOT is the only US grid operator publishing a classified large-load queue — no national aggregate exists.
GE Vernova: 116 GW turbines in backlog + slot reservations; $176B total backlog; data-center orders >$5B YTD. Transformer lead times ~128 weeks (power) / ~144 (GSU). Water: data centers ≈9% of annual consumptive use in the Washington-metro Potomac basin (~4 MGD average), projected ~22 MGD by 2050.GEV verified; transformers weak (secondhand); water verified
Flared gas (the waste line)
North Dakota flared 173.3 MMcf/d of natural gas in July 2026, even at a 95.3% statewide capture rate (Bakken 95.6%).verified
US vented and flared gas: 335.2 bcf in 2024 (≈9.5 bcm).verified (conversion is ours)
Global gas flaring rose a third straight year to 167 bcm in 2025.verified
World Bank Global Gas Flaring Tracker, Jun 2026 — satellite estimates (NOAA VIIRS, processed by the Payne Institute), not site measurements. The report says US flaring fell ~7% (−0.4 bcm) in 2025; the exact US volume is in the report's figures and is not printed here.
Flare-gas compute is real: Crusoe began in 2018 putting computing on Bakken flare gas ("digital flare mitigation"), and is now lead developer of the Stargate Abilene campus — first buildings live Sep 2025, planned 1.2 GW.verified
Society
Bots: 51% of web traffic automated in 2024 (37% malicious) — past human traffic for the first time in a decade, per the report's own framing.verified
AI-cited job cuts (Challenger "Artificial Intelligence" category): 4,247 (2023) → 12,742 (2024, derived) → 54,836 (2025) → 120,136 (Jan–Sep 2026). AI was the leading stated reason five straight months through Jul 2026. Total announced cuts Jan–Sep 2026: 573,195.verified except 2024 (derived)
Employer-attributed announced cuts, not net job losses; the separate "Technological Update" category is excluded; 2024 derived from Challenger's cumulative figures. Monthly 2026 table:
layoffs page.
ChatGPT: 1.2B+ weekly users (OpenAI, Sep 29, 2026, repeated Oct 7); 900M+ Feb 27, 2026; timeline to 100M weekly (Nov 2023) with provenance labels.verified base; pace extrapolation is ours
Measured pace between the two 2026 statements: ~1.40M/day (16.2/s); the board's counter runs it forward, labeled. Interpolated 1B crossing: ~May 9, 2026.
Timeline page.
.ai domains: 598,007 registrations on Jan 2, 2025; "surpassed one million" January 2026.registry via press; weak on exact current count
Via Domain Name Wire and an Anguilla government post. Anguilla's .ai revenue reached EC$230.5M in 2025 per local press (currency inferred from headline — flagged).
The Reckoning model, v1.0
The board's one editorial layer: our estimate of when AI becomes the default condition of the economy. Not a measurement, a market, a poll, or anyone's forecast but ours — it exists to be argued with, which is why every input is here. It is kept visually and structurally separate from the sourced data, and it carries no Dataset markup.
The ten conditions
- Machines outnumber humans on the web — met 2024 (51% automated traffic; Imperva-network scope).
- A grid capacity auction clears short of its requirement — met Dec 2025 (PJM 2027/28, 6,623 MW short; repeated Jul 2026 for 2028/29 at 6,831 MW).
- One AI product passes a billion weekly users — met ~May 2026 (interpolated between OpenAI's Feb and Sep 2026 statements).
- Big-4 infrastructure spend passes $500B a year — met with the four quarters to Jun 2026 ($513.8B, filings).
- AI takes the majority of venture capital — met Q3 2026 (64%, Crunchbase).
- 100,000+ job cuts in a year citing AI — met 2026 (120,136 by September, Challenger).
Pending:
- First reactor restarted for a tech buyer — Crane targeted 2027 (Constellation; sourced projection).
- Data centers take a tenth of US electricity — 4.4% in 2023; LBNL projects 6.7–12% by 2028. High case crosses 10% by 2028; extrapolating the low case's implied growth (8.77%/yr relative) puts 10% near 2033. This condition sets the range.
- 10 GW of hyperscaler nuclear announced — 7,754 MW to date; at the ~3.6 GW/yr pace measured Sep 2024–Oct 2026, crossing ~mid-2027 (our extrapolation; no new deal since Jan 2026).
- A frontier lab reports crossing its autonomy threshold, as defined in published scaling policies (e.g. autonomous replication in Anthropic's RSP — v1.0 cited; the policy has later versions) — no sourced projection exists; we extrapolate the overall crossing pace (6 conditions in 2.25 years ≈ 2.7/yr) to ~2028. The model's weakest input, and we say so.
The estimate
range = crossing window of the slowest pending condition = condition 8 = [2028, 2033]
point = midpoint = 2030.5 → displayed as 2031
countdown = days to Jan 1, 2031 (display convention)
What moves it: a pending condition crossing, a met condition being revised away, LBNL/IEA updating projections, or a versioned model revision logged below. The conditions, thresholds and midpoint rule are editorial choices; different conditions give a different year — that is why the machinery is published.
The ChatGPT-era strip
- $1.09T: Microsoft, Alphabet, Amazon and Meta capital spending summed over the filed quarters Q4 2022 – Q2 2026 (big-4 only, no NVIDIA — no overlap). The earlier combined figure ($1.62T incl. NVIDIA revenue, overlapping) was retired from the board on Oct 20 and lives only here for the record. ChatGPT launched Nov 30, 2022 (OpenAI blog), one month into Q4.
- ×31 models: 101,574 archived Hugging Face repositories on Dec 15, 2022 → 3,157,435 on Oct 16, 2026.
- ~$64 per person: $513.8B big-4 trailing-year capex ÷ the 8 billion people the UN counted on Nov 15, 2022. Population has grown since, so today's per-head figure is slightly smaller. (The earlier ~$99 figure used the overlapping combined flow and was retired.)
The scorecard — we grade our own extrapolations
Every forward-looking figure this site publishes is logged here with its date, and graded publicly at later re-bases: right, wrong, or revised, with the arithmetic. Sourced third-party projections (IEA, LBNL) are theirs to grade; these are ours.
| Published | The claim | Due | Grade |
| 2026-10-20 | Buildout Index crosses 1,000 around mid-2027, if the 2022–26 pace holds | Q2 2027 re-base | pending |
| 2026-10-20 | Hyperscaler nuclear announcements cross 10 GW ~mid-2027 at the measured ~3.6 GW/yr pace | mid-2027 | pending |
| 2026-10-20 | Reckoning condition 7: first reactor restart for a tech buyer in 2027 (Constellation's own target) | end 2027 | pending |
| 2026-10-20 | ChatGPT counter pace: ~16.2 users/sec beyond the Sep 29 statement | next official OpenAI figure | pending |
| 2026-10-20 | Reckoning point estimate: 2031 (range 2028–2033), model v1.0 | standing; re-graded each re-base | pending |
The archive — the board remembers itself
Every re-base is frozen at a permanent URL under /archive/ — the board and its data files exactly as published that day. Old citations stay checkable forever, and the record of what this site said, and when, is itself public. Snapshots are never edited after the fact; corrections happen on the live board and in the changelog.
What we cut, and why
- Live stock prices / market caps — audited Stooq, Alpha Vantage, Finnhub, Twelve Data, Cboe, Nasdaq/NYSE and IEX: no free route permits public ad-supported display without an agreement (IEX's delayed feed permits redistribution but has no web API; Wikidata's CC0 market caps run months stale). The watchlist shows sourced events only until a licensed route exists.
- Global AI query energy — Google publishes 0.24 Wh per median Gemini text prompt (Aug 2025), but global query volume is unpublished; any global figure would be invented.
- Global data-center water — only incomparable per-company reports exist; we show the Potomac-basin study instead.
- Summed tokens/day across providers — one-off disclosures with incompatible definitions.
- % of new content that is AI-generated — rests on AI-detector studies with known false-positive problems.
- Crowd forecasts of AGI — Metaculus's terms require written permission for commercial reuse; nothing of theirs appears here.
- USPTO AI patent counts and proposed-data-center map pins — no current official count; the best proposed-sites dataset is non-commercial-only.
Embed a counter — free
Any site may embed BRAIAIN counters at no cost. Copy one line, swap the c= value:
<iframe src="https://www.braiain.com/embed.html?c=spend" width="340" height="110" style="border:0" title="BRAIAIN counter" loading="lazy"></iframe>
Counters: spend (building AI, $/s) · vc (VC into AI) · users (ChatGPT weekly users pace) · kwh (data-center electricity) · index (the Buildout Index level) · flared (North Dakota flaring). Each card links back here and carries its source and date; values are baked at each re-base, and moving ones run the measured paces described above. We may block embeds on sites that misrepresent the figures.
About & corrections
BRAIAIN is researched, written and maintained as a solo project (a dnilgis project). Corrections are welcome and logged: open an issue on the project's GitHub repository (dnilgis/braiain) with the figure, the problem, and a source. Cite any figure as "via braiain.com" with its original source named — the original source is always the authority. Compiled datasets on this site are CC BY 4.0; underlying sources keep their own terms.
Changelog
| Date | Change |
| 2026-10-20 | v4 (consumer-panel revision): hero changed from the combined overlapping flow to big-4 capex only ($16,282/s); since-ChatGPT and per-person figures re-derived on the clean basis ($1.09T; ~$64); Stargate per-second counter removed as hypothetical; PJM chapter rewritten (who PJM serves, price translated to ¢/kWh, bill pass-through sourced, pre-jump range corrected to $16–174); plain-language conversions added throughout with their arithmetic; "basics" page added; Reckoning day-counter dropped, range-first display, thresholds-set date stated; watchlist relabeled with selection criteria and no-holdings note. |
| 2026-10-20 | v2: Index re-based from Q3 2025 = 100 to Q1 2022 = 100 on a fully backfilled 18-quarter series (level 647.7; the two bases describe the same flow). Added: the wall of measured-pace counters, US data-center map (OpenStreetMap), PJM 22-year series, EIA series, Hugging Face archived series, ChatGPT timeline, GPU rental and token prices, Epoch research panel, per-metric pages with CSV/JSON downloads, printable readout. Reckoning v1.0 corrections: condition 2 (grid auction) first met Dec 2025, not Jul 2026; ChatGPT pace re-anchored to the Sep 29 statement; nuclear pace recomputed to ~3.6 GW/yr (estimate unchanged: 2031, range 2028–2033). |
| 2026-10-20 | Board launched (v1): Buildout Index base Q3 2025 = 100; Reckoning model v1.0 (2031, range 2028–2033, 6/10 met). |